Request a quote
A page from a sample handover pack index, listing the ITP and NCR registers

ITP and work package plan drafting

Inspection and test plans and work package plans, written from scratch for your project, with hold and witness points, acceptance criteria and the records you need.

Price
From £295Per ITP. Packs, WPPs and the monthly service are quoted.
Turnaround
First drafts in 5 working daysFrom receipt of the specification, drawings and programme.
Quote
1 working dayOnce we've seen the specification and activity list.

ITPs are written by an engineer who has written and approved ITPs on major UK infrastructure. Each one follows your specification, the project requirements and the relevant MCHW series, and a chartered engineer checks it before issue.

Inspection and test plan page from the sample school project pack, top of the page (watermarked extract)

What we write

  • Inspection and test plans (ITPs) for each activity, with hold and witness points, acceptance criteria, the records required and who is responsible
  • Work package plans (WPPs) setting out the sequence, resources, interfaces and responsibilities for each package
  • Drafted to your specification, the project requirements and the relevant MCHW series, such as Series 500 drainage, Series 600 earthworks and Series 1700 concrete, plus culverts and structures
  • Issued in Word, Excel or your own template
Please note

WPP safety content is reviewed against your RAMS and CDM duties; your site team stays responsible for safe systems of work.

Fees

Inspection and test plan (ITP)
From £295 each
Packs of ITPs and work package plans (WPPs)
Quoted within 1 working day
Monthly ITP and WPP service
Monthly rates on requestA set number of ITPs and WPPs each month · 3-month minimum

From specification to issued ITPs

  1. Send the documents

    Day 0

    Your specification, drawings and programme.

  2. Quote

    Within 1 working day

    The fee, within 1 working day.

  3. First draft

    Per the quote

    In 5 working days.

  4. Check and sign-off

    Before issue

    Checked and signed off, then your comments addressed.

  5. Issued

    In your format

    In Word, Excel or your template.

What we draft to

Your specification
The contract specification and project requirements come first.
MCHW Series 500, 600 and 1700
Drainage, earthworks and concrete, plus culverts and structures where they apply.
CDM 2015
WPPs aligned to your RAMS and to contractor duties under CDM 2015.

ITP and WPP questions

Can you use our template?

Yes. If you don't have one, we'll use Word or Excel.

Do you do RAMS?

No. RAMS stay with the contractor. We align the ITPs and WPPs to your RAMS so they agree.

Are the ITPs written for our project?

Yes, from scratch, to your specification and drawings. We don't recycle another job's ITPs.

How does the monthly ITP and WPP service work?

A fixed monthly fee covers a set number of ITPs and WPPs, with a 3-month minimum. Unused documents do not roll over. Ask and we'll quote it.

New package starting?

Send the specification and the activity list. We confirm the number of ITPs and WPPs, the fee and the first-draft date.